The whole process should take about 10-15 minutes, and may include a brief interruption of your power. If you have any questions about the worker or the meter, call the utility, at 1-86, for ComEd, and 1-80, for Ameren. A utility worker or contractor with a uniform and appropriate ID will replace your old meter with a new one in the same spot.To do this, the ends of the two hot load wires are stripped and connected to the bottom two load terminals on the meter's hot bus bars. The load side of the electric meter, which carries power to the main service panel, can be wired either directly to the panel or to an interim disconnect. A digital meter is a meter that gives a separate reading, in the form of a decimal number, for each given input quantity. digital meter in Electrical Engineering An analog meter has a needle in it and reads like a gas gauge in a car, while a digital meter detects really low voltage and is more precise.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |